Skip to content
DrillSense

Data ≠ Decisions.

Derrick, the oil and gas agent in your iMessage.

Illustrative iPhone lock screen: Derrick's Live Activity for Blue Heron 9H shows rotary drilling on bottom at 12,620 ft bit and hole depth, ROP 178 ft/h 10-minute average, surface 120 rpm. Capture 06:00 CDT; source 05:58 CDT.
DrillingRotary · On bottom · 05:58Bit depth12,620 ftROP · 10m avgSurfaceHole depth+6%178ft/h120rpm12,620ft

Data ≠ Decisions.

Illustrative iPhone lock screen: Derrick's Live Activity for Blue Heron 9H shows rotary drilling on bottom at 12,620 ft bit and hole depth, ROP 178 ft/h 10-minute average, surface 120 rpm. Capture 06:00 CDT; source 05:58 CDT.

Illustrative iMessage thread at 6:00 AM: asked how the Blue Heron is looking, Derrick replies it is drilling at 12,620 ft and added 1,510 ft overnight, with a card showing rig time, ROP 178 ft/h and weight on bit 32.4 klbf.

Dashboard ≠ Derrick.

Illustrative iMessage thread at 6:00 AM: asked how the Blue Heron is looking, Derrick replies it is drilling at 12,620 ft and added 1,510 ft overnight, with a card showing rig time, ROP 178 ft/h and weight on bit 32.4 klbf.

Illustrative iMessage thread at 6:01 AM: the user asks Derrick to show the cuttings the crew mentioned on the radio, and Derrick replies You should see them now.

Described ≠ Measured.

Illustrative iMessage thread at 6:01 AM: the user asks Derrick to show the cuttings the crew mentioned on the radio, and Derrick replies You should see them now.

Illustrative iMessage thread at 6:01 AM: asked to show the cuttings the crew mentioned on the radio, Derrick replies You should see them now, and a Cuttings panel opens with sample 7 of 8 at 12,560 ft MD, analyzed 05:56 CDT.

Described ≠ Measured.

Illustrative iMessage thread at 6:01 AM: asked to show the cuttings the crew mentioned on the radio, Derrick replies You should see them now, and a Cuttings panel opens with sample 7 of 8 at 12,560 ft MD, analyzed 05:56 CDT.

Illustrative DrillSense drilling brief for Blue Heron 9H at 06:00 CDT: rotary drilling on bottom at 12,620 ft MD, +1,510 ft over the 18:00 to 06:00 night shift, rig-time breakdown, drilling parameters and 17 connections with a 3 minute median.

Report ≠ Reality.

Illustrative DrillSense drilling brief for Blue Heron 9H at 06:00 CDT: rotary drilling on bottom at 12,620 ft MD, +1,510 ft over the 18:00 to 06:00 night shift, rig-time breakdown, drilling parameters and 17 connections with a 3 minute median.

Synthetic example · Blue Heron 9H · 06:00 CDT · source 05:58 CDT

Derrick meets people where the work happens.

DrillSense connects the data behind him.

A day in the life · five people

Separate illustrative day
02:40

The driller

Rig radio · channel 3

“Driller, this is Derrick. The slowdown is a hard limestone layer, not a worn bit. The offset wells were through it in about 40 feet.”

02:52

The operations geologist

iMessage · at home, on call
Illustrative lock screen at 02:52 on Tuesday, October 13. Blue Heron 9H is at 12,402 ft, ROP 84 ft/h and rotary 62 rpm, with sample time 02:40. Derrick flags gamma up since 12,380 ft, calcium falling, and leaving the top of the target. This is a separate illustrative day from the hero.Illustrative iMessage thread displayed at 02:53: after a 02:52 question asking where the well is, Derrick reports 12,402 ft, gamma up since 12,380 ft and calcium falling. The geologist chooses Draft it, and Derrick replies that the update is drafted to the steering project and waits for them.
05:30

The operations center

Email · six rigs, two people
Illustrative Outlook inbox for a synthetic operations center: Derrick's 5:30 AM morning brief, Six rigs. One clear picture., is selected. Bison Ranch 14-22H is up 1,510 ft since 18:00 at 12,620 ft MD bit depth, with a steering chart showing the latest survey 9 ft above the Wolfcamp A base.
Illustrative Derrick morning brief email, Six rigs. One clear picture. Bison Ranch 14-22H is up 1,510 ft since 18:00 at 12,620 ft MD, with the latest survey 9 ft above the Wolfcamp A base. The other five rigs: Salt Creek 4H in slips at 13,100 ft MD, Mesa Verde 2H pulling out with tool at 9,020 ft, Cedar Canyon 7H drilling at 11,420 ft MD, Juniper Draw 8H running casing, and Red Hills 11H activity unconfirmed, last feed 05:18.
07:15

The drilling engineer

Microsoft Teams · the office
Search
···DE
Activity
Chat
Teams
Calendar
Calls
Files
Teams
DBDelaware Drilling
GeneralRig 42 · LateralCompletionsGeology
DBRig 42 · Lateral
PostsFiles
DEDrilling engineer7:14 AM
Derrick drag on the last stand?
DerrickApp7:15 AM
18 klbf overpull at 12,740 ft. Two offsets showed the same signature before a pack‑off.Open depth chart · Bison Ranch 14-22H
Reply
DBRig 42 · Lateral
DEDrilling engineer7:14 AM
@Derrick drag on the last stand?
DerrickApp7:15 AM
18 klbf overpull at 12,740 ft. Two offsets showed the same signature before a pack‑off.Open depth chart · Bison Ranch 14-22H
14:20

The completions engineer

DrillSense · planning stages
2:20 PMTue Oct 2082%
DrillSenseSynthetic DB 14-22H
DrillingGeologyCompletions
DERRICKnow
Synthetic DB 14-22HStage 21 · placement check
Stages 11, 12 and 14 ran within 12 ft of the lime stringer. Stage 21 sits higher, near the lower shale marker.

Deployed with major oil and gas operators

Derrick on the surface. DrillSense underneath.

Operators
41
Wells to date
1,000+
Rigs
100+
Feet of wellbore analyzed
14M+
Unique target formations
40+
Basins
6
States
7

Built in the open

Standards and alliances

  • OSDU Forum
  • Energistics
  • Open Secure AI Alliance

Programs

  • AWS Activate
  • NVIDIA Inception

Partners

  • Claude Partner Program

Works with

  • Claude
  • ChatGPT

Add DrillSense to Claude or ChatGPT.

Access

Apply for an invite.

Tell us where you drill and what you'd text Derrick first.

Apply for an invite